PROJECT

The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation.

  • DESCRIPTION: Construction of a booster Electricity Substation at 33/220 kV with a transformer position.
  • DATE: 2015 – 2016
  • LOCATION: Copiapó Province, Atacama Region (Chile).
  • TYPE: EPC
  • VOLTAGE: 33/220 KV
  • CLIENT: Confidential