PROJECT The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new booster substation. DESCRIPTION: Construction of a booster Electricity Substation at 33/220 kV with a transformer position. DATE: 2015 – 2016 LOCATION: Copiapó Province, Atacama Region (Chile). TYPE: EPC VOLTAGE: 33/220 KV CLIENT: Confidential Share this article: Share on FacebookShare on Facebook TweetShare on Twitter Share on LinkedInShare on LinkedIn Pin itShare on Pinterest Share on WhatsAppShare on WhatsApp