The purpose of the work, located in the Atacama Region (Chile), was to interconnect the Carrera Pinto solar plant by means of a new 220kV transmission line, 3km in length, to the Carrera Pinto Substation.

  • DESCRIPTION: Construction of a single Simplex Circuit high-voltage line, 3 Km in length and at 220 kV, with numerous crossings.
  • DATE: 2015 – 2016
  • LOCATION: Copiapó Province, Atacama Region (Chile).
  • TYPE: EPC
  • VOLTAGE: 220 KV
  • CLIENT: Confidential