PROYECT The purpose of the work, located in the Atacama Region (Chile), was to interconnect the Carrera Pinto solar plant by means of a new 220kV transmission line, 3km in length, to the Carrera Pinto Substation. DESCRIPTION: Construction of a single Simplex Circuit high-voltage line, 3 Km in length and at 220 kV, with numerous crossings. DATE: 2015 – 2016 LOCATION: Copiapó Province, Atacama Region (Chile). TYPE: EPC VOLTAGE: 220 KV CLIENT: Confidential Share this article: Share on FacebookShare on Facebook TweetShare on Twitter Share on LinkedInShare on LinkedIn Pin itShare on Pinterest Share on WhatsAppShare on WhatsApp