PROJECT The project, located in the Atacama Region (Chile), consisted of the high-voltage construction of a new panel of the Carrera Pinto substation, with solution by means of “PASS” hybrid equipment. DESCRIPTION: Expansion of Electricity Substation at 220 kV DATE: 2015 – 2016 LOCATION: Copiapó Province, Atacama Region (Chile). TYPE: EPC VOLTAGE: 33/220 KV CLIENT: Confidential Share this article: Share on FacebookShare on Facebook TweetShare on Twitter Share on LinkedInShare on LinkedIn Pin itShare on Pinterest Share on WhatsAppShare on WhatsApp