DESCRIPTION Bolero involves of a photovoltaic plant comprising 288.266 panels with a installed capacity of 86 MW. The project will employ a máximum of 273 workers during the construction stage and 15 permanent staff when in operation. The project was initially submitted as Laberinto, which entailed two plants (now Bolero Este and Bolero Oeste) located side by side to be developed simultaneously. INSTALLED POWER CAPACITY: 86 MW Engineering and construction of the photovoltaic plant. LOCATION: Chile DATE: 2015 – 2016 TYPE: EPC CLIENT: Confidential PANELS: 288.266 PILES: 41.604 TABLES: 13.817 TRACKERS: 532 (multifile solution) Share this article: Share on FacebookShare on Facebook TweetShare on Twitter Share on LinkedInShare on LinkedIn Pin itShare on Pinterest Share on WhatsAppShare on WhatsApp